Our activities in Steel, Cement and Mining Industry

Presentation of our Steel / Cement / Mining projects

Overview of our projects is also comming here

 
Aligning, vibration analyses, rooth coarse analyses of gearbox of brand KRUPP
Inspection of gearbox of brand KRUPP in Tanzania. Our customer has repaired the pinion shaft of the gearbox. The repaired pinion bearings temperature was raising to 90 degree centigrade and also running with high vibration. Our customer asked to inspect the gearbox to report its condition.
KRUPP SN11/1400/9 Tanzania
May 2011
 
Inspection and repair of planetary gearbox of brand SEISA
- Inspection and temporary repair to be able to run on 50% of it's capacity
- Production of outer ring gear of 3 meter + planetairy gears + sun gear + new white metall bearings in 6 weeks
- After receival of new part, we machined the outer ring gear local to fit on the other parts of the housing in an local machine shop
- Full assembly of the gearbox
- Commissioning on-site including aligning, vibration analyses and videoscopic checks
SEISA DPP323H Pakistan
December 2010
 
Inspection of gearbox in Serbia
- Inspection of gearbox.
FLENDER CS0280/710 Majdanpek, Serbia
December 2010
 
Overhaul of gearbox of brand FLENDER
- Overhaul of an complete broken gearbox:
- Inspection and measuring gears on-site
- Checking the gearbox housing in an local machine shop + re-machining the bores
- Production of an complete new set of internals hardened and gear-grinded class 4 in 2,5 weeks
- Checking gear-assembly on run-out test bed
- Assembling on-site
FLENDER H2SH Size 24 South Africa / Zambia
March 2010
 
Repair of Flender gearbox DMGH22
- inspection and measurements in U.A.E.
- production of an case hardend pinion of 2 meters long
- assembly of gearbox and testrun
FLENDER DMGH22 Dibba, U.A.E
February 2010
 
Aligning, vibration analyses, rooth coarse analyses of gearbox of brand KRUPP
Several companies allready have measured the noise and vibrations of this KRUPP gearbox. We offered not only to measure the installation, but promised to solve the problem. After checking and correcting the alignment, we examined the relation between the axial movement of the input shaft and the noise production of the dryer drum. We are now proposing a modification of the installation.
Krupp Belgium
March 2010
 
Gearbox RENK PA63p Inspection and Overhaul
Inspection and overhaul of gearbox. Performing a inspection including non-destructive research of the bearings, planetary wheels and other internals. Performing a rooth coarse analyse and determining repair proposal. Repair of all neccessary parts and test run in our facility.
After transport field commissioning on-site of the customer.
RENK PA63p India
October 2009