SEW SSG-5
Gearbox SEW SSG 5 Inspection and Overhaul
![]() |
![]() |
![]() |
![]() |
![]() |
| SEW | ![]() |
|
| SSG-5 | ||
| Scope of work: | ||
| Performing a standard overhaul your gearbox, including visual inspection on site with an endoscope through a threaded hole. The standard overhaul consists mainly of: • General cleaning and disassembly of all components. • Inspection and reporting. (stop point) • The drawing up of the entire inside, including geometry of the teeth. • Assembly and testing. Turnaround gearbox overhaul: • The inspection will be within 3 days after delivery gearbox ready. • The time required by us to carry out revision work will be reported in inspection report aswell as associated costs for revision. Refurbishment works and supplies including: • The information you provide to gearbox completely dismantle and cleaning. • Inspecting the components comprising: Cabinet House: - The visual check of the closet at home cracks, where possible. - Checking the preservation of visual internal and external. - Checking the drilling damage and sizes. Inside: - Checking condition of the teeth of all the gearing. - Checking the bearings for damage phenomena. - The check images and flank wear twists of all gearing. - Checking the Asmat t.p.v. the bearings, oil seals, gears and links to dimensions and lesions. • The renewal of the bearings and seals, supply SB Worldwide • Update of various consumables like gaskets, mountings, etc, supply SB Worldwide • The refit of the gearbox. • If necessary, machining the surfaces of the bearing covers to get the correct axial bearing clearances. • Monitoring and recording of images and flank wear twists in the inspection. • Monitoring and recording of the axial clearances in the inspection. • Bench test preparations, gear preparation, fill with oil and no- load test for 4 hours, at which this decline will be presented to a representative Sitech Manufacturing Services. • Gearbox ready for shipment. • The delivery within 2 weeks after sending a complete overhaul file containing the report form, trial protocol and turn drawings (DWG) of the inside. |
||
| Location - date: | ||
| The Netherlands - September 2009 | ||






