Our activities in Bulk & Container Handling
Overview of our gearbox inspection and repair projects in the Bulk & Container Handling Industry
The Bulk & Container Handling Industry is an important industry for us. Since we are located in The Netherlands near Rotterdam, we do a lot of project for the port of Rotterdam. On this page will find a collection of projects we have done in this industry. By clicking on one of the links below, you can see the details of the project.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling and cleaning of the complete gearbox.
- Performing of the repair constructions.
The conversion operations consists of:
- Disassembling and cleaning of the complete gearbox.
- Performing of the repair constructions.
Disassembling, cleaning and a inspection of the gearbox.
Controlling the inside for bursts.
Replacing of seals and bearings.
Renewing of the pinion shaft.
Location, day 1
- Breaking of the output coupling and cable drums.
- Moving of the cable drums on lacation, so we can disassemble the output shaft from the gearbox.
- Lifting up the output shaft on location and transporting to our working place.
- Breaking of the input coupling and moving of the E-motor.
The conversion operations consists of:
- A visual inspection, a test run and the complete installing of the gear on location.
- Preparing a test run in our working place for two hours.
- Disassembling of the gearbox.
- Renewing all the seals.
The conversion operations consists of:
- Disassembling of the gearbox with the complete gearwheel on location.
- The visual controlling of the delivered gearbox.
- Conserving the inside and the outside of the gearbox.
The conversion operations consists of:
- Disassembling, cleaning and an inspection of the gearbox.
- Performing of the repair constructions.
- Renewing of the seals and bearings.
The conversion operations consists of:
- Disassembling and an inspection of two friction shafts.
- Performing of the repair constructions.
- Deploying of the inspection report.
The conversion operations consists of:
- Disassembling, cleaning and an inspection of the gearbox.
- Performing of the repair constructions.
- Renewing of the seals and bearings.
- Re-assembling of the gearbox.
Location, day 1
- Breaking of the output coupling and cable drums.
- Moving of the cable drums on lacation, so we can disassemble the output shaft from the gearbox.
- Lifting up the output shaft on location and transporting to our working place.
- Breaking of the input coupling and moving of the E-motor.
The conversion operations consists of:
- Disassembling, cleaning and a visual inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Re-assembling of the gearbox.
The conversion operations consists of:
- Disassembly of the bogie and the gearboxes.
- Cleaning of the parts.
- Inspection of the parts.
- Measuring of the flank backlash on the gears of the gearboxes.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Renewing of the coupling.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Renewing of the coupling.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Renewing of the coupling.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
WGW KSHK 1330 S/So
This report provides the findings of the exported visual inspection
and the vibratiuon measurement to the gearbox.
The purpose of the inspection is to determine the condition of the gearbox.
At the inspection of the gearbox is used a videoscope.
and the vibratiuon measurement to the gearbox.
The purpose of the inspection is to determine the condition of the gearbox.
At the inspection of the gearbox is used a videoscope.
ZPMC FH1060.2.24.A2A
- Performing of the repair constructions.
CONRAD STORK 3R 560 S/3
- Performing of the repair constructions.
CONRAD STORK 3R 560 S/3
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
FLENDER KBH 400/S/So
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
FLENDER KBH 400/S/So
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
FLENDER KBH 400/S/So
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
KONE THV-350
KUMERA LD 4500-25-R-E1
- Moving of the cable drums on lacation, so we can disassemble the output shaft from the gearbox.
- Lifting up the output shaft on location and transporting to our working place.
- Breaking of the input coupling and moving of the E-motor.
FLENDER SVN 400
The follow instructions were produced at the gearbox:
Disassembling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:
KONE THV-328H
- Preparing a test run in our working place for two hours.
- Disassembling of the gearbox.
- Renewing all the seals.
KUMERA LD 4500-25-R-E1
- The visual controlling of the delivered gearbox.
- Conserving the inside and the outside of the gearbox.
WGW KSHK 1330 S/So
- Performing of the repair constructions.
- Renewing of the seals and bearings.
PIV LC180-12H
- Performing of the repair constructions.
- Deploying of the inspection report.
KUYPERS 572845
- Performing of the repair constructions.
- Renewing of the seals and bearings.
- Re-assembling of the gearbox.
PHB KSZg 355 Pu
- Moving of the cable drums on lacation, so we can disassemble the output shaft from the gearbox.
- Lifting up the output shaft on location and transporting to our working place.
- Breaking of the input coupling and moving of the E-motor.
FLENDER KBH 400/S/So
- Performing of the repair constructions.
- Deploying of the inspection report.
- Re-assembling of the gearbox.
SANTASALO YE4-0680HW100-313VTS
Revisionconstruction and supply comprehensive:
- Disassembling of the fourteen gearboxes.
- Inspection of all parts of the gearboxes:
- Disassembling of the fourteen gearboxes.
- Inspection of all parts of the gearboxes:
PHB 3-SZ-500-So
- Cleaning of the parts.
- Inspection of the parts.
- Measuring of the flank backlash on the gears of the gearboxes.
SANTASALO 3-TKC-180-NE
- Performing of the repair constructions.
- Deploying of the inspection report.
- Renewing of the coupling.
PHB 3-SG-710 II
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
PHB K3SVZg-500
- Performing of the repair constructions.
- Deploying of the inspection report.
- Renewing of the coupling.
SANTASALO 3TKC180NE
- Performing of the repair constructions.
- Deploying of the inspection report.
- Renewing of the coupling.
SANTASALO 3TKC180NE
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
PHB 3-SZ-500-So