GBS Gearbox Services international brand of Schaaf- en Boorwerk Rotterdam B.V.
Emergency Hotline
GBS Gearbox Services international

Our activities in Bulk & Container Handling

Overview of our gearbox inspection and repair projects in the Bulk & Container Handling Industry

The Bulk & Container Handling Industry is an important industry for us. Since we are located in The Netherlands near Rotterdam, we do a lot of project for the port of Rotterdam. On this page will find a collection of projects we have done in this industry. By clicking on one of the links below, you can see the details of the project.

Pagina:
Previous 1 ... 10 11 12 13 14 ... 22 Next

  • The conversion operations consists of:
  •     - Disassembling, cleaning and inspection of the gearbox.
        - Performing of the repair constructions.
        - Deploying of the inspection report.
        - Stop point.
    WGW KSHK 1330 S/So
    Inspection and revision on WGW KSHK 1330 S/So gearbox
    Inspection and revision on WGW KSHK 1330 S/So gearbox
    The Netherlands
    The Netherlands
    November 2013
    This report provides the findings of the exported visual inspection
    and the vibratiuon measurement to the gearbox.
    The purpose of the inspection is to determine the condition of the gearbox.
    At the inspection of the gearbox is used a videoscope.
    ZPMC FH1060.2.24.A2A
    Vibration measurement and inspection on a ZPMC gearbox
    Vibration measurement and inspection on a ZPMC gearbox
    The Netherlands
    The Netherlands
    November 2013
  • The conversion operations consists of:
  •     - Disassembling and cleaning of the complete gearbox.
        - Performing of the repair constructions.
    CONRAD STORK 3R 560 S/3
    Inspection and revision on Conrad Stork 3R 560 S/3
    Inspection and revision on Conrad Stork 3R 560 S/3
    The Netherlands
    The Netherlands
    November 2013
  • The conversion operations consists of:
  •     - Disassembling and cleaning of the complete gearbox.
        - Performing of the repair constructions.
    CONRAD STORK 3R 560 S/3
    Inspection and revision on Conrad Stork 3R 560 S/3
    Inspection and revision on Conrad Stork 3R 560 S/3
    The Netherlands
    The Netherlands
    November 2013
       Revisionconstruction and supply comprehensive:
       - Disassembling and cleaning of the gearbox.
       - Inspection of all parts of the gearbox:
    FLENDER KBH 400/S/So
    Inspection and revision on Flender KBH 400/S/So gearbox
    Inspection and revision on Flender KBH 400/S/So gearbox
    The Netherlands
    The Netherlands
    November 2013
       Revisionconstruction and supply comprehensive:
       - Disassembling and cleaning of the gearbox.
       - Inspection of all parts of the gearbox:
    FLENDER KBH 400/S/So
    Inspection and revision on Flender KBH 400/S/So gearbox
    Inspection and revision on Flender KBH 400/S/So gearbox
    The Netherlands
    The Netherlands
    November 2013
       Revisionconstruction and supply comprehensive:
       - Disassembling and cleaning of the gearbox.
       - Inspection of all parts of the gearbox:
    FLENDER KBH 400/S/So
    Inspection and revision on Flender KBH 400/S/So gearbox
    Inspection and revision on Flender KBH 400/S/So gearbox
    The Netherlands
    The Netherlands
    November 2013
       Revisionconstruction and supply comprehensive:
       - Disassembling and cleaning of the gearbox.
       - Inspection of all parts of the gearbox:
    KONE THV-350
    Inspection and revision on a Kone THV-350 gearbox
    Inspection and revision on a Kone THV-350 gearbox
    The Netherlands
    The Netherlands
    October 2013
  • Disassembling, cleaning and a inspection of the gearbox.
  • Controlling the inside for bursts.
  • Replacing of seals and bearings.
  • Renewing of the pinion shaft.
  • KUMERA LD 4500-25-R-E1
    Inspection and revision on Kumera  LD 4500-25-R-E1
    Inspection and revision on Kumera  LD 4500-25-R-E1
    The Netherlands
    The Netherlands
    October 2013
  • Location, day 1
  •     - Breaking of the output coupling and cable drums.
        - Moving of the cable drums on lacation, so we can disassemble the output shaft  from the gearbox.
        - Lifting up the output shaft on location and transporting to our working place.
        - Breaking of the input coupling and moving of the E-motor.
    FLENDER SVN 400
    Repairing oil leakage on Flender SVN 400
    Repairing oil leakage on Flender SVN 400
    The Netherlands
    The Netherlands
    October 2013
    The follow instructions were produced at the gearbox:
  • Disassembling and cleaning of the gearbox.
  • Inspection of the parts consisting of the following instruction:
  • KONE THV-328H
    Inspection and revision on Kone THV-328H
    Inspection and revision on Kone THV-328H
    The Netherlands
    The Netherlands
    October 2013
  • The conversion operations consists of:
  •     - A visual inspection, a test run and the complete installing of the gear on location.
        - Preparing a test run in our working place for two hours.
        - Disassembling of the gearbox.
        - Renewing all the seals.
    KUMERA LD 4500-25-R-E1
    Making a new gearset and inspection on Kumera LD 4500-25-R-E1
    Making a new gearset and inspection on Kumera LD 4500-25-R-E1
    The Netherlands
    The Netherlands
    October 2013
  • The conversion operations consists of:
  •     - Disassembling of the gearbox with the complete gearwheel on location.
        - The visual controlling of the delivered gearbox.
        - Conserving the inside and the outside of the gearbox.
    WGW KSHK 1330 S/So
    Making a new gearset on WGW KSHK 1330 S/So
    Making a new gearset on WGW KSHK 1330 S/So
    The Netherlands
    The Netherlands
    October 2013
  • The conversion operations consists of:
  •     - Disassembling, cleaning and an inspection of the gearbox.
        - Performing of the repair constructions.
        - Renewing of the seals and bearings.
    PIV LC180-12H
    Inspection and revision on PIV LC180-12H
    Inspection and revision on PIV LC180-12H
    The Netherlands
    The Netherlands
    October 2013
  • The conversion operations consists of:
  •     - Disassembling and an inspection of two friction shafts.
        - Performing of the repair constructions.
        - Deploying of the inspection report.
    KUYPERS 572845
    Inspection and revision on Kuypers 572845
    Inspection and revision on Kuypers 572845
    The Netherlands
    The Netherlands
    October 2013
  • The conversion operations consists of:
  •     - Disassembling, cleaning and an inspection of the gearbox.
        - Performing of the repair constructions.
        - Renewing of the seals and bearings.
        - Re-assembling of the gearbox.
    PHB KSZg 355 Pu
    Inspection and revision Swing on PHB KSZg 355 Pu
    Inspection and revision Swing on PHB KSZg 355 Pu
    The Netherlands
    The Netherlands
    October 2013
  • Location, day 1
  •     - Breaking of the output coupling and cable drums.
        - Moving of the cable drums on lacation, so we can disassemble the output shaft from the gearbox.
        - Lifting up the output shaft on location and transporting to our working place.
        - Breaking of the input coupling and moving of the E-motor.
    FLENDER KBH 400/S/So
    Rebuilding and a test run on Flender KBH 400/S/So
    Rebuilding and a test run on Flender KBH 400/S/So
    The Netherlands
    The Netherlands
    October 2013
  • The conversion operations consists of:
  •     - Disassembling, cleaning and a visual inspection of the gearbox.
        - Performing of the repair constructions.
        - Deploying of the inspection report.
        - Re-assembling of the gearbox.
    SANTASALO YE4-0680HW100-313VTS
    Vibration measurement and visual inspection on a Santasalo gearbox
    Vibration measurement and visual inspection on a Santasalo gearbox
    The Netherlands
    The Netherlands
    September 2013
       Revisionconstruction and supply comprehensive:
       - Disassembling of the fourteen gearboxes.
       - Inspection of all parts of the gearboxes:
    PHB 3-SZ-500-So
    Disassembling and assembling again and align of 14 gearboxes
    Disassembling and assembling again and align of 14 gearboxes
    The Netherlands
    The Netherlands
    September 2013
  • The conversion operations consists of:
  • - Disassembly of the bogie and the gearboxes.
    - Cleaning of the parts.
    - Inspection of the parts.
    - Measuring of the flank backlash on the gears of the gearboxes.
    SANTASALO 3-TKC-180-NE
    Inspection and revision on a Santasalo 3-TKC-180-NE gearbox
    Inspection and revision on a Santasalo 3-TKC-180-NE gearbox
    The Netherlands
    The Netherlands
    September 2013
  • The conversion operations consists of:
  •     - Disassembling, cleaning and inspection of the gearbox.
        - Performing of the repair constructions.
        - Deploying of the inspection report.
        - Renewing of the coupling.
    PHB 3-SG-710 II
    Running small coax on a PHB 3-SG-710 II gearbox
    Running small coax on a PHB 3-SG-710 II gearbox
    The Netherlands
    The Netherlands
    September 2013
       Revisionconstruction and supply comprehensive:
       - Disassembling and cleaning of the gearbox.
       - Inspection of all parts of the gearbox:
    PHB K3SVZg-500
    Inspection and revision on PHB K3SVZg-500
    Inspection and revision on PHB K3SVZg-500
    The Netherlands
    The Netherlands
    September 2013
  • The conversion operations consists of:
  •     - Disassembling, cleaning and inspection of the gearbox.
        - Performing of the repair constructions.
        - Deploying of the inspection report.
        - Renewing of the coupling.
    SANTASALO 3TKC180NE
    Inspection and revision on a Santasalo 3-TKC-180-NE gearbox
    Inspection and revision on a Santasalo 3-TKC-180-NE gearbox
    The Netherlands
    The Netherlands
    September 2013
  • The conversion operations consists of:
  •     - Disassembling, cleaning and inspection of the gearbox.
        - Performing of the repair constructions.
        - Deploying of the inspection report.
        - Renewing of the coupling.
    SANTASALO 3TKC180NE
    Inspection and revision on a Santasalo 3-TKC-180-NE gearbox
    Inspection and revision on a Santasalo 3-TKC-180-NE gearbox
    The Netherlands
    The Netherlands
    September 2013
       Revisionconstruction and supply comprehensive:
       - Disassembling and cleaning of the gearbox.
       - Inspection of all parts of the gearbox:
    PHB 3-SZ-500-So
    Inspection and revision on a PHB 3-SZ-500-So gearbox
    Inspection and revision on a PHB 3-SZ-500-So gearbox
    The Netherlands
    The Netherlands
    September 2013

    Pagina:
    Previous 1 ... 10 11 12 13 14 ... 22 Next