Our activities in Bulk & Container Handling
Overview of our gearbox inspection and repair projects in the Bulk & Container Handling Industry
The Bulk & Container Handling Industry is an important industry for us. Since we are located in The Netherlands near Rotterdam, we do a lot of project for the port of Rotterdam. On this page will find a collection of projects we have done in this industry. By clicking on one of the links below, you can see the details of the project.
Gearbox casing
- The inside conservation was in poor condition. We had to scrape,
to degrease and to conserve in the excisting colour.
The follow instructions were produced at the gearbox:
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling of the gearbox.
- Modifying of the gearbox.
- Performing of the repair constructions.
- Assembling of the input coupling and output cable drum.
The conversion operations consists of:
- Disassembling and cleaning of the gearbox.
- Performing of the repair constructions.
- Renewing of the seals and bearings.
- Re-assembling of the gearbox.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Renewing og all seals, bearings and innerrings.
- Renewing of diverse small items such as gaskets and bolts.
The conversion operations consists of:
- A visual inspection of the gearbox.
- Performing of the repair constructions.
- Vibration measurement, probably damages at the bearings of the output shaft.
The conversion operations consists of:
- Disassembling and cleaning of the gearbox.
- Performing of the repair constructions.
- Renewing of the seals and bearings.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling and cleaning of the gearbox.
- Performing of the repair constructions.
- Renewing of the seals and bearings.
The conversion operations consists of:
- Disassembling of the inside of the gearbox, the bearings not yet.
- Renewing of all seals and bearings.
- Disassembling and inspection of the input and the output coupling.
The conversion operations consists of:
- Disassembling, cleaning and an inspection of the gearbox.
- Performing of the repair constructions.
- Renewing of the seals and bearings.
The conversion operations consists of:
- Disassembling of the gearbox.
- Performing of the repair constructions.
- Bearingdamages on the gearwheel.
Inside of the box:
- Controlling of the condition of the serrations of all gearings.
- Controlling of the bearings for damages.
- Controlling for the flatness of the contact patterns and the flank backlashes of all gearings.
- Controlling of the shaftsizes in way of the bearings, oilseals and couplings for dimensions and damages.
The conversion operations consists of:
- Disassembling and cleaning of the complete gearbox.
- Performing of the repair constructions.
The conversion operations consists of:
- Renewing of the pinion and the journal bearings of the gearbox.
- Renewing of the bullgear and re-using of the output shaft.
to degrease and to conserve in the excisting colour.
WGW SC 1,5/SO
- Renewing of all seals and bearings.
- Renewing of various consumables such as gaskets and mounting hardware.
- Re-assembling of the gearbox.
FLENDER KADS 160-K
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
M.A.N. 08-208
- Modifying of the gearbox.
- Performing of the repair constructions.
- Assembling of the input coupling and output cable drum.
PIV PD31-R10-H14
The follow instructions were produced at the gearbox:
Disassembling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:
VALMET K-80F
This report provides the findings of the exported visual inspection to the gearbox.
The purpose of the inspection is to determine the condition of the gearbox.
REINTJES WAF 5555
The follow instructions were produced at the gearbox:
Disassembling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:
PIV PLC18-R11-G11
- Performing of the repair constructions.
- Renewing of the seals and bearings.
- Re-assembling of the gearbox.
WGW KSHK 1330 S/So
- Performing of the repair constructions.
- Renewing og all seals, bearings and innerrings.
- Renewing of diverse small items such as gaskets and bolts.
KUMERA TNC34002BX504-125
The follow instructions were produced at the gearbox:
Disassembling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:
CONRAD STORK 2x 2R630
The follow instructions were produced at the gearbox:
Disassembling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:
HANSEN PHF23-BRN-12,5
The follow instructions were produced at the gearbox:
Disassembling, cleaning and inspection of the gearbox.
Inspection of the parts consisting of the following instruction:
PIV LB180-12H
- Performing of the repair constructions.
- Vibration measurement, probably damages at the bearings of the output shaft.
WGW AA-SCZ-600-2-S
- Performing of the repair constructions.
- Renewing of the seals and bearings.
WGW KS 5,75/S/So
The follow instructions were produced at the gearbox:
Disassembling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:.
PIV PD31-R10-H14
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
MIELE FAKR1-155-S
The follow instructions were produced at the gearbox:
Disassembling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:
MIELE FAKR1-155-S
- Performing of the repair constructions.
- Renewing of the seals and bearings.
SIEMENS B2-DH-14C
- Renewing of all seals and bearings.
- Disassembling and inspection of the input and the output coupling.
DEMAG 200 ZW/KR
This report provides an overview of the findings, obtained during the repair, testing
and installation of the main trolley gearbox.
- All bearings have been renewed.
- All seals have been renewed.
- The gearbox is cleaned internally and externally.
and installation of the main trolley gearbox.
- All bearings have been renewed.
- All seals have been renewed.
- The gearbox is cleaned internally and externally.
ZPMC FH1610.28.C3B-00
- Performing of the repair constructions.
- Renewing of the seals and bearings.
PIV PD31-R10-H14
- Performing of the repair constructions.
- Bearingdamages on the gearwheel.
SANTASALO 3TKC180NE
- Controlling of the bearings for damages.
- Controlling for the flatness of the contact patterns and the flank backlashes of all gearings.
- Controlling of the shaftsizes in way of the bearings, oilseals and couplings for dimensions and damages.
FLENDER KDA 320
- Performing of the repair constructions.
FLENDER KDA 320
- Renewing of the bullgear and re-using of the output shaft.
RENK HSU-750 D