Our activities in Bulk & Container Handling
Overview of our gearbox inspection and repair projects in the Bulk & Container Handling Industry
The Bulk & Container Handling Industry is an important industry for us. Since we are located in The Netherlands near Rotterdam, we do a lot of project for the port of Rotterdam. On this page will find a collection of projects we have done in this industry. By clicking on one of the links below, you can see the details of the project.
The conversion operations consists of:
- Performing of a visual inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
- Performing of the repair constructions.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
- Performing of the repair constructions.
The conversion operations consists of:
- Inspection of the complete gearbox.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
- Performing of the repair constructions.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
- Performing of the repair constructions.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
- Performing of the repair constructions.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
- Performing of the repair constructions.
- Inspection of all parts of the gearbox:
- Inspection of all parts of the gearbox:
The conversion operations consists of:
- Disassembling of the inside but not yet the bearings.
- Cleaning of the gearbox.
- Replacing of the seals.
- Disassembling and inspection of the input and output coupling.
The conversion operations consists of:
- Disassembling and cleaning of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling and cleaning of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
Gearbox casing
- Outside box was in poor condition, we had to scrape, to polish,
to degrease and to conserve in the excisting colour.
- Inside box was in poor condition.
The conversion operations consists of:
- Disassembling, cleaning and a visual inspection of the gearbox.
- Performing of the repair constructions.
- Renewing of all seals and bearings.
- Renewing of the output shaft.
The conversion operations consists of:
- Disassembling and cleaning of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling and cleaning of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Interchanging of the gearbox.
- Performing of the repair constructions.
- Construction of the Malmedie coupling.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
Gearbox casing
- Inside box was in poor condition, we had to scrape, to polish,
to degrease and to conserve in the excisting colour.
- Outside box was in poor condition.
- Deploying of the inspection report.
- Stop point.
ASUG GL-100
- Deploying of the inspection report.
- Stop point.
- Performing of the repair constructions.
FLENDER CG 26-100
- Deploying of the inspection report.
- Stop point.
- Performing of the repair constructions.
WGW DKBH 1500/So
- Deploying of the inspection report.
- Stop point.
PHB KSZg 355 Pu
- Deploying of the inspection report.
- Stop point.
- Performing of the repair constructions.
PHB KSZg 355 Pu
- Deploying of the inspection report.
- Stop point.
- Performing of the repair constructions.
M.A.N. 1
- Deploying of the inspection report.
- Stop point.
M.A.N. 1
- Deploying of the inspection report.
- Stop point.
- Performing of the repair constructions.
WGW KCH 355/S/So
- Deploying of the inspection report.
- Stop point.
- Performing of the repair constructions.
WGW KCH 355/S/So
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
- Inspection of all parts of the gearbox:
CONRAD STORK 3R 355 S/3
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.- Inspection of all parts of the gearbox:
FLENDER KDA 320
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.- Inspection of all parts of the gearbox:
FLENDER KDA 320
- Cleaning of the gearbox.
- Replacing of the seals.
- Disassembling and inspection of the input and output coupling.
DEMAG 200 ZW/KR
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
ZPMC IFH1230.24.A1B-00
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
WERNER & PFLEIDERER ZSK 83-R240
The follow instructions were produced at the gearbox:
Disassembling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:.
FLENDER E2HL Size 10
to degrease and to conserve in the excisting colour.
- Inside box was in poor condition.
HANSEN RNG24-S
- Performing of the repair constructions.
- Renewing of all seals and bearings.
- Renewing of the output shaft.
ZPMC TB220.13.D1B-00
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
ZPMC FH1230.24.A1B-00
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
FLENDER KBH 400/S/So
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
PHB KSZg 355 Pu
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
FLENDER KBH 400/S/So
- Performing of the repair constructions.
- Construction of the Malmedie coupling.
DEMAG 200 ZW/KR
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
FLENDER Sonder 195
to degrease and to conserve in the excisting colour.
- Outside box was in poor condition.
WGW SC 1,5/SO