On gearbox Pekrun ASR 160 we performed a revision.
Drawing the inside.
Disassembling and cleaning the gearbox.
Inspection and report our findings to our client.
PEKRUN ASR 160
Inspection and drawing of the inside of gearbox Pekrun ASR 160
Inspection and drawing of the inside of gearbox Pekrun ASR 160
Belgium
Belgium
August 2012
Our engineers performed an inspection on the gearbox
We disassembled and cleaned the gearbox.
Founding that the bearings were damaged.
Renewed the bearings and sealings.
Assembling the gearbox again and made a test run.
PEKRUN ASR 160
Inspection and revision on gearbox Pekrun ASR 160
Inspection and revision on gearbox Pekrun ASR 160
Belgium
Belgium
August 2012
Our proceedings:
- Disassembling, cleaning and inspection.
- Making a complete inspection report for our client.
- Revision according to revision proposal.

We renewed all of the bearings and sealings.
When this was done, we assembled the gearbox and made a test run with a test run report.
MAPRE E.2.6.100-02
Inspection and revision on gearbox MAPRE E.2.6.100-02
Inspection and revision on gearbox MAPRE E.2.6.100-02
The Netherlands
The Netherlands
July 2012
- Disassembling
- Cleaning
- Inspection with inspection report
- Assist and advise our client
FLENDER ZSK70
Assist our client with gearbox FLENDER ZSK70
Assist our client with gearbox FLENDER ZSK70
The Netherlands
The Netherlands
July 2012
Disassembling of gearbox WGW SBHN 6,5 onsite.
The pinion was damaged, we had to repair it.
We transported the damaged pinion to our workshop for inspection.
We were able to repair the damage and the new pinion
was send back to our client.
WGW SBHN 6,5
Renewing of the pinion of gearbox TWK WGW SBHN 6,5
Renewing of the pinion of gearbox TWK WGW SBHN 6,5
Belgium
Belgium
June 2012
On gearbox SEW RF100-L6200 we performed a complete inspection.
First we disassembled and cleaned the gearbox. After that
we were able to inspect all parts. The bearings and sealings
had to be renewed. We renewed them and performed a test run
with a test run report.
SEW RF100-L6200
Inspection and revision on gearbox SEW RF-100-L6200
Inspection and revision on gearbox SEW RF-100-L6200
Belgium
Belgium
June 2012
Performing visual inspections on different gearboxes.
The inspections were performed at our customer.
Toho Seisakusho ZMPZ-750B
Visual inspection on different gearboxes
Visual inspection on different gearboxes
Belgium
Belgium
June 2012
Standard overhauling on gearbox SEW SSG-5.
We disassembled and cleaned all of the gearbox parts.
After cleaning, we could do our inspection.
We renewed all bearings and sealings.
Our findings were reported to our client.
SEW SSG-5
Inspection and revision on gearbox SEW SSG-5
Inspection and revision on gearbox SEW SSG-5
The Netherlands
The Netherlands
June 2012
Performing a visual inspection with our endoscope on gearbox JSW DRS 150.9-LHP.
We disassembled and cleaned this gearbox.
All the damaged parts where renewed.
JSW DRS 150.9-LHP
Inspection and revision on gearbox JSW DRS 150.9-LHP
Inspection and revision on gearbox JSW DRS 150.9-LHP
Belgium
Belgium
June 2012
Performing an overhaul on gearbox NF11-BN-2,68.
We renewed the inside of the gearbox.
The overhauling includes:
- Disassembling and cleaning of the gearbox.
- Inspection with report.
- Assembling and test run.
HANSEN NF11-BN-2,68
Inspection and revision on gearbox Hansen NF-11-BN-2,68
Inspection and revision on gearbox Hansen NF-11-BN-2,68
Belgium
Belgium
May 2012
Performing a standard overhaul on gearbox Marley 68-4626A.
A standard overhaul:
- Disassembling.
- Cleaning.
- Inspection.
- Reporting our findings to our client.
MARLEY 68-4626A
Overhauling and inspection on gearbox Marley 68-4626A
Overhauling and inspection on gearbox Marley 68-4626A
Belgium
Belgium
May 2012
Performing:
- Disassembling, cleaning and inspection.
- Repairing of the shafts.
- Assembling of the gearbox.
- Test run with test run report.
HOLROYD Size WU 6
Inspection and revision on gearbox Holroyd Size WU 6
Inspection and revision on gearbox Holroyd Size WU 6
Belgium
Belgium
May 2012
Performing a standard overhaul on gearbox Lightnin Serie 70 & 80. This includes:
- Disassembling and cleaning the gearbox.
- Visual inspection for any tears or leaks.
- Checking for the condition of the gears.
- Assembling the gearbox again.
LIGHTNIN Serie 70 & 80
Inspection and revision on gearbox Lightnin Serie 70 & 80
Inspection and revision on gearbox Lightnin Serie 70 & 80
Belgium
Belgium
May 2012
Overhaul on gearbox Lightnin 88S - 75.
Disassembling and cleaning the gearbox.
Visual inspection all of the parts for any tears or damages.
LIGHTNIN 88S - 75
Overhaul and inspection on gearbox Lightnin 88S - 75
Overhaul and inspection on gearbox Lightnin 88S - 75
Belgium
Belgium
May 2012
Performing a standard overhaul on gearbox SEW SF-90-EXD.
Our findings were reported to our client.
We renewed all of the bearings and sealings and assembled the gearbox again.
A test run is our final step to check if everything is alright.
SEW SF-90-EXD
Inspection and revision on gearbox SEW SF-90-EXD
Inspection and revision on gearbox SEW SF-90-EXD
Belgium
Belgium
May 2012
Performing an overhaul on gearbox Chemineer 2-HTN-3.
The overhauling contains:
- Disassembling and cleaning all of the parts.
- Inspection with inspection report.
- Assembly and making a test run.
CHEMINEER 2-HTN-3
Performing an overhaul on gearbox Chemineer 2-HTN-3
Performing an overhaul on gearbox Chemineer 2-HTN-3
The Netherlands
The Netherlands
May 2012
Performing a standard overhaul on gearbox Kachelmann AH-50A.
Renewed all gear sets.
Overhauling includes:
- Disassembling and cleaning all of the parts.
- Inspection with inspection report.
- Assembling and test run with test run report.
KACHELMANN AH-50A
Inspection and overhaul on gearbox Kachelmann AH-50A
Inspection and overhaul on gearbox Kachelmann AH-50A
The Netherlands
The Netherlands
May 2012
First we disassembled gearbox of Kachelmann, type AH-50A.
We cleaned the gearbox.
For our visual inspection we used our endoscope, including reporting of the two gearboxes.
At last, we assembled and made a test run.
KACHELMANN AH-50A
Visual inspection on two gearboxes of Kachelmann onsite
Visual inspection on two gearboxes of Kachelmann onsite
The Netherlands
The Netherlands
May 2012
Performing a standard overhaul on gearbox Chemineer 4-HTN-5.
Overhauling contains:
- Complete disassembly and cleaning all of the parts.
- Inspection and reporting.
- Assembly and making a test run.
CHEMINEER 4-HTN-5
Overhauling on gearbox Chemineer 4-HTN-5
Overhauling on gearbox Chemineer 4-HTN-5
The Netherlands
The Netherlands
May 2012
The overhauling contains:
- Complete disassembly and cleaning all of the parts
- Inspection and reporting
- Assembly and making a test run.
CHEMINEER 4-HTN-5
Performing an overhaul on gearbox Chemineer 4-HTN-5
Performing an overhaul on gearbox Chemineer 4-HTN-5
The Netherlands
The Netherlands
May 2012
- Disassembling, cleaing and inspecting the gearbox.
- Performing a test run and reporting on gearbox Bierens AB-36,5 spec.
BIERENS AB-36,5-spec
Test run and reporting on gearobx Bierens AB-36,5 spec.
Test run and reporting on gearobx Bierens AB-36,5 spec.
Belgium
Belgium
April 2012
Performing:
- Disassembling, cleaning and inspeting gearbox BIERENS-K2-A3-55.
- Setting up a complete inspection report.
BIERENS K2A3-55
Inspection and revision on gearbox Bierens K2-A3-55
Inspection and revision on gearbox Bierens K2-A3-55
Belgium
Belgium
April 2012
- Disassembling, cleaing and inspecting the gearbox.
- Performing a test run and reporting on gearbox Bierens AB-36,5 spec.
BIERENS AB-36,5 spec.
Test run and reporting on gearobx Bierens AB-36,5 spec.
Test run and reporting on gearobx Bierens AB-36,5 spec.
Belgium
Belgium
March 2012
On gearbox TGW 107 we performed and inspection and revision.
We first disassembled and cleaned all of the parts.
After that, we could do our inspection on all of the parts.
Our client was invited to report our findings.
We found that the bearings were damaged, so we had to
repair them. After repairing we were able to perform the test run.
TGW 107
Inspection and revision on gearbox TGW 107
Inspection and revision on gearbox TGW 107
Belgium
Belgium
March 2012
Our engineers performed a visual inspection on gearbox ABB DL SL 1800 S8.
First we disassembled and cleaned the gearbox. Visual
inspection was possible now. All our findings were reported to our client.
ABB DP SL 1800 S8
Visual inspection on gearbox ABB DP SL 1800 S8
Visual inspection on gearbox ABB DP SL 1800 S8