  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Performing of the repair constructions.
    - Renewing of all seals and bearings.
    HANSEN RNF24-BNN-12,5
    Inspection and revision on Hansen RNF24-BNN-12,5
    Inspection and revision on Hansen RNF24-BNN-12,5
    Belgium
    Belgium
    October 2013
  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Deploying of the inspection report.
    - Stop point.
    LEIPZIG GMBH 06-1434-03800-ESL
    Inspection and revision on Leipzig 06-1434-03800-ESL
    Inspection and revision on Leipzig 06-1434-03800-ESL
    Belgium
    Belgium
    October 2013
  • Inside first gear set
  • - In way of the oil seal, rough-turn at seal location, add chrome to surface and fine-turn.
    - The toothing is regrinded minimal.
    HANSEN RNF24-BNN-12,5
    Lev. a complete inside of an gearbox and an oil pump of Hansen RNF24-BNN-12,5
    Lev. a complete inside of an gearbox and an oil pump of Hansen RNF24-BNN-12,5
    Belgium
    Belgium
    October 2013
  • The conversion operations consists of:
  • - A visual inspection of the gearbox on location.
    - Deploying of the inspection report.
    - Renewing of all seals, bearings and innerrings.
    ABB HXR-450LH2
    Visual inspection and reporting on 6 gearboxes
    Visual inspection and reporting on 6 gearboxes
    Belgium
    Belgium
    October 2013
  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Deploying of the inspection report.
    - Stop point.
    HANSEN OR1001447-QVRB2L-CUN
    Inspection and revision on Hansen OR1001447-QVRB2L-CUN
    Inspection and revision on Hansen OR1001447-QVRB2L-CUN
    The Netherlands
    The Netherlands
    October 2013
  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Deploying of the inspection report.
    - Stop point.
    PHILADELPHIA 3420-CT
    Inspection and revision on Philadelphia 3420-CT
    Inspection and revision on Philadelphia 3420-CT
    The Netherlands
    The Netherlands
    September 2013
  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Deploying of the inspection report.
    - Stop point.
    REXNORD SPRN84C18U-G-280-L-5
    Inspection and revision on a Rexnord SPRN84C18U-G-280-L-5 gearbox
    Inspection and revision on a Rexnord SPRN84C18U-G-280-L-5 gearbox
    The Netherlands
    The Netherlands
    September 2013
  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Performing of the repair constructions.
    - Deploying of the inspection report.
    FRIEDRICH UE30S
    Inspection and revision on Friedrich UE30S
    Inspection and revision on Friedrich UE30S
    Belgium
    Belgium
    September 2013
  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Deploying of the inspection report.
    - Stop point.
    HANSEN 811-AN
    Inspection and revision on Hansen 811-AN
    Inspection and revision on Hansen 811-AN
    Belgium
    Belgium
    September 2013
  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Deploying of the inspection report.
    - Stop point.
    M.A.N. 08-208
    Inspection and revision of landing gear M.A.N.
    Inspection and revision of landing gear M.A.N.
    The Netherlands
    The Netherlands
    August 2013
  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Deploying of the inspection report.
    - Stop point.
    SEW RM-107-AM-00
    Inspection and revision on SEW RM-107-AM-00
    Inspection and revision on SEW RM-107-AM-00
    Belgium
    Belgium
    August 2013
  • Gearbox
  • - Disassembling, cleaning and inspection of the gearbox.
    - Assembling and adjusting of the gearbox.
    - Performing of a test run with a report.
    WGW KCN 140
    Inspection and revision on a WGW KCN 140 gearbox
    Inspection and revision on a WGW KCN 140 gearbox
    The Netherlands
    The Netherlands
    August 2013
  • The conversion operations consists of:
  • - Making of a complete new casing.
    - Assembling and a test run of the gearbox.
    - Conserving the gearbox internally and externally.
    BHS TG-28
    Making a new gearset on BHS TG-28
    Making a new gearset on BHS TG-28
    The Netherlands
    The Netherlands
    August 2013
  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Deploying of the inspection report.
    - Stop point.
    FLENDER FZAF108B
    Inspection and revision on Flender FZAF108B
    Inspection and revision on Flender FZAF108B
    The Netherlands
    The Netherlands
    August 2013
  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Deploying of the inspection report.
    - Stop point.
    GRAESSNER GR. 60L
    Inspection and revision on Graessner GR. 60L
    Inspection and revision on Graessner GR. 60L
    The Netherlands
    The Netherlands
    July 2013
  • The conversion operations for additional work:
  • - Performing of a visual inspection on location.
    - Performing of the repair constructions.
    - Analysing and deploying of a report.
    ABB FAN-DPSL.1800.S8
    Visual inspection and vibration measurement on 2 gearboxes
    Visual inspection and vibration measurement on 2 gearboxes
    Belgium
    Belgium
    June 2013
  • The conversion operations for additional work:
  • - Performing of a visual inspection on location.
    - Performing of the repair constructions.
    - Analysing and deploying of a report.
    ABB DMG-250
    Visual inspection on ABB ASEA-BROWN-BOVERI-
    Visual inspection on ABB ASEA-BROWN-BOVERI-
    Belgium
    Belgium
    June 2013
  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Deploying of the inspection report.
    - Stop point.
    TGW NK SCN 180
    Inspection and revision on TGW gearbox
    Inspection and revision on TGW gearbox
    The Netherlands
    The Netherlands
    May 2013
    Revisionconstruction and supply comprehensive:
    - Disassembling and cleaning of the gearbox.
    - Inspection of all parts of the gearbox:

  • Gearbox casing:
  • - A visual inspection of the gearbox casing for bursts.
    AMARILLO S-750
    Inspection and revision on Amarillo S-750
    Inspection and revision on Amarillo S-750
    The Netherlands
    The Netherlands
    May 2013
  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Performing of the repair constructions.
    - Deploying of the inspection report.
    LIGHTNIN LS-75
    Inspection and revision on Lightnin LS-75
    Inspection and revision on Lightnin LS-75
    Belgium
    Belgium
    May 2013
  • Gearbox casing
  • - We had to rebush one drilling.
    - Inside box was in poor condition, we had to scrape, to polish, to degrease
      and to conserve in the excisting colour.
    - Outside box was in poor condition.
    BIERENS KA55-35
    Inspection and revision on Bierens KA55-35
    Inspection and revision on Bierens KA55-35
    The Netherlands
    The Netherlands
    April 2013
  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Performing of the repair constructions.
    - Controlling of the serrations and the output for bursts.
    BUSS G-160
    Inspection and revision on Buss G-160
    Inspection and revision on Buss G-160
    The Netherlands
    The Netherlands
    April 2013
  • The conversion operations consists of:
  • - A visual inspection of the gearbox with the aid of a videoscope through the inspection cover.
    - Performing of the repair constructions.
    - Deploying of the inspection report.
    FLENDER H2-SV-7B
    Visual inspection on Flender H2-SV-7B
    Visual inspection on Flender H2-SV-7B
    The Netherlands
    The Netherlands
    March 2013
  • The conversion operations consists of:
  • - Performing of an inspection and a vibration measurement of the gearbox.
    - Performing of the repair constructions.
    - Deploying of the inspection report.
    TGW 107
    Visual inspection and vibration measurement on TGW 107 gearbox
    Visual inspection and vibration measurement on TGW 107 gearbox
    Belgium
    Belgium
    February 2013
  • The conversion operations consists of:
  • - Performing of a visual inspection of the gearbox with the aid of a videoscope on location.
    - Analysing and deploying of the inspection report.
    JSW GP450T
    Inspection of an gearbox
    Inspection of an gearbox
    Belgium
    Belgium
    January 2013